Search by job, company or skills
Collect the PF from the Design.
Entering details into register (order booked and committed date).F-CPS 01
Study & Review the PF.
a. Drawing / Inputs.
b. Specification.
c. Delivery time.
4. Plan for the material.
Raise the material requisition (MRN) for the fallowing
a. Bought out items.
b. Raw materials.
c. Give the cutting sizes through cutting book.
6. Production Planning, according to the availability of the shop floor load either In house / Out house depending on priority.
Enter the details into Weekly production plan (Component + Assembly).
Enter the details into Active Planning sheet based on the delivery schedule discussing
With
Date Posted: 20/06/2024
Job ID: 82522647